2019
Auckland, New Zealand
Project Requirements
Once the existing swimming and spa pool linings had been removed, it was found that extensive concrete repairs and waterproofing measures would be needed.
Repairs had to be of sufficient strength and suitability to meet the critical demands of the waterproofing application. Following these repairs, a new waterproofing layer was to be applied to the inside of the pools and surrounding podium prior to plaster and tile finishes.
Challenges
Not only was Sika responsible for the waterproofing membrane itself, but the underlying repairs and substrate had to accommodate the pressure and weight of a swimming pool full of water. For this reason, high-strength Sika MonoTop® repair mortars and Sikadur® epoxies were specified. Reinforcing mesh was used throughout the Sikalastic®-152 application for additional strength.
As the swimming pool and podium are fully exposed to the elements, the system also needed to handle variable weather, including sun and rain for the duration of its life.
Sika Products
Sika® MonoTop-412 N
Sika® MonoTop-438 R
Sikadur®-32
Sikadur®-31 CF Normal
SikaCeram®-255 StarFlex LD
Sikalastic®-152
Project Participants
Specifier
Sika NZ Ltd
Main Contractor
Bronson Construction Ltd
Specialist Contractor
Tile Tech Ltd