Greenfield Wastewater Treatment and Water Recycling Facility, Doha North, Qatar
Greenfield Wastewater Treatment and Water Recycling Facility, Doha North, Qatar

Keppel Seghers Corporation was awarded a design-build-operate contract for the construction of the $1.5 billion Doha North waster water treatment plant. HBK construction was appointed main contractor.

Coatzacoalcos Tunnel, Mexico
Coatzacoalcos Tunnel, Mexico

The Coatzacoalcos River Tunnel is a 1.6 km long tunnel connecting the Petrochemical Industrial Zone of “Villa Allende” with the port of Coatzacoalcos, located at the Gulf of Mexico.

Search results  58  in 204,4 ms
           
No Download/Name Doctype Lang Format Size
1 Milan Underground System References Construction (Sika at Work) English pdf 0,93 MB
Milan Underground System

Short description

Elongation M1 Metrofiera;
M 3 Dergano – Comasina, the new automatic M5, Milan, Italy

Date: 4/12/12
07_09_saw_metro_milano.pdf
Download pdf

2 New Mercedes-Benz Plant, Kecskemét, Hungary References Construction (Sika at Work) English pdf 1,30 MB
New Mercedes-Benz Plant, Kecskemét, Hungary

Short description

Sika ViscoCrete: A new production plant for Mercedes-Benz has been built in the Hungarian city of Kecskemét. The investment for this new plant will be approximately 800 Million Euro and will create around 2,500 new jobs.

Date: 4/12/12
No17_saw_mercedes-benz_hungary_low.pdf
Download pdf

3 New R&D Building at Sika in Zurich References Construction (Sika at Work) English pdf 1,09 MB
New R&D Building at Sika in Zurich

Short description

Fair-Faced Concrete with Sika® PerFin. The façade is made out of self-compacting concrete (SCC) with a fair-faced appearance in a thin-wall construction of only ten centimeter without any movement joints.

Date: 8/21/12
saw_sika perfin.pdf
Download pdf

4 Newly Constructed Silo Installation References Construction (Sika at Work) English pdf 0,77 MB
Newly Constructed Silo Installation

Short description

Erected with Slipform Technology.
- Port of Basel, Switzerland

Date: 4/12/12
37_09_saw_port_of_basel.pdf
Download pdf

5 Nove Divadlo Pilsen References Construction (Sika at Work) English pdf 0,19 MB
Nove Divadlo Pilsen

Short description

Sika Architectural Concrete

Date: 7/15/15
905_saw_Nove_Divadlo_Pilsen_Czech_Republic.pdf
Download pdf

6 Potrerillos’s Hydroelectric Central References Construction (Sika at Work) English pdf 0,88 MB
Potrerillos’s Hydroelectric Central

Short description

Potrerillos, Mendoza, República Argentina.

Date: 8/21/12
08_09_saw_potrerillos_argentina.pdf
Download pdf

7 Precast tubbing production for the tunnel in Gdansk, Poland References Construction (Sika at Work) English pdf 1,22 MB
Precast tubbing production for the tunnel in Gdansk, Poland

Short description

Concrete Production: Sika® ViscoCrete®, Sika® Aer, Waterproofing: Sikadur®, Concrete Protection: Sika® TR

Date: 7/16/15
SAW_Tunneling_Gdansk_Poland.pdf
Download pdf

8 Queens Diamond Jubilee Center, UK References Construction (Sika at Work) English pdf 0,21 MB
Queens Diamond Jubilee Center, UK

Short description

Sika Watertight Concrete

Date: 7/15/15
903_saw_Queens_Diamond_Jubilee_Center_UK.pdf
Download pdf

9 Radès-La Goulette Bridge References Construction (Sika at Work) English pdf 0,78 MB
Radès-La Goulette Bridge

Short description

Construction Project, Tunisia.

Date: 4/12/12
40_saw_pond de Rades_Tunesien_web.pdf
Download pdf

10 Repair of Adlertunnel Liestal/Muttenz, Switzerland References Construction (Sika at Work) English pdf 1,04 MB
Repair of Adlertunnel Liestal/Muttenz, Switzerland

Short description

10 years after completion the 5.3km Adler railway tunnel, arch cracks occurred at about 40 meters due to excessive swelling of Gypsum Keuper in the surrounding geology, so substantial repair works were required.

Date: 4/12/12
07_11_saw_adlertunnel.pdf
Download pdf