Greenfield Wastewater Treatment and Water Recycling Facility, Doha North, Qatar
Greenfield Wastewater Treatment and Water Recycling Facility, Doha North, Qatar

Keppel Seghers Corporation was awarded a design-build-operate contract for the construction of the $1.5 billion Doha North waster water treatment plant. HBK construction was appointed main contractor.

Coatzacoalcos Tunnel, Mexico
Coatzacoalcos Tunnel, Mexico

The Coatzacoalcos River Tunnel is a 1.6 km long tunnel connecting the Petrochemical Industrial Zone of “Villa Allende” with the port of Coatzacoalcos, located at the Gulf of Mexico.

Search results  58  in 281,9 ms
           
No Download/Name Doctype Lang Format Size
1 Footbridge in Brugg-Windisch, Switzerland References Construction (Sika at Work) English pdf 0,77 MB
Footbridge in Brugg-Windisch, Switzerland

Short description

With a total length of 182 m, the Aare Footbridge is the longest stressed ribbon bridge in Switzerland.

Date: 4/12/12
No03_saw_Footbridge in Brugg-Windisch_low.pdf
Download pdf

2 Gotthard Railway Base Tunnel References Construction (Sika at Work) English pdf 1,55 MB
Gotthard Railway Base Tunnel

Short description

Sections Bodio / Faido and Sedrun, Switzerland.

Date: 4/12/12
01_09_saw_gotthard_base_tunnel.pdf
Download pdf

3 Grand Pier, Weston-Super-Mare, United Kingdom References Construction (Sika at Work) English pdf 0,55 MB
Grand Pier, Weston-Super-Mare, United Kingdom

Short description

Sika Construction Concrete

Date: 7/15/15
884_saw_Grand_Pier_Weston-Super-Mare_UK.pdf
Download pdf

4 Hope Hospital, Salford, UK References Construction (Sika at Work) English pdf 0,58 MB
Hope Hospital, Salford, UK

Short description

Sika Construction Concrete

Date: 7/16/15
883_saw_Hope_Hospital_Salford_UK.pdf
Download pdf

5 Kiruna Mine, Sweden References Construction (Sika at Work) English pdf 0,69 MB
Kiruna Mine, Sweden

Short description

Iron ore extraction under hard conditions

Date: 12/12/13
saw_kiruna-mine_sweden.pdf
Download pdf

6 Klimkovice Highway Tunnel References Construction (Sika at Work) English pdf 1,11 MB
Klimkovice Highway Tunnel

Short description

Highway D47, Nord Moravia, Czech Republic.

Date: 4/12/12
05_saw_klimkovice_highway_tunnel.pdf
Download pdf

7 Kárahnjúkar Hydroelectric Project, Iceland References Construction (Sika at Work) English pdf 1,10 MB
Kárahnjúkar Hydroelectric Project, Iceland

Short description

This is the heart of Iceland’s largest-ever industrial development; a € 1.1 billion hydroelectric power plant that took 5 years to build and required the construction of 73 km of tunnels and five dams for three reservoirs.

Date: 4/6/17
saw-Karahnjukar Hydroelectric Project_Iceland_low.pdf
Download pdf

8 Library of Birmingham, UK References Construction (Sika at Work) English pdf 0,28 MB
Library of Birmingham, UK

Short description

Sika Watertight Concrete

Date: 7/15/15
904_saw_Library_of_Birmingham.pdf
Download pdf

9 LNG Regasification&Storage Terminal Project References Construction (Sika at Work) English pdf 1,30 MB
LNG Regasification&Storage Terminal Project

Short description

The project required the construction of a new sea terminal for receiving the liquefied natural gas from ships, plus facilities for its regasification, storage and distribution.

Date: 4/12/12
28_saw_regasification_storage_plant_mexico_low.pdf
Download pdf

10 Metro Dubai References Construction (Sika at Work) English pdf 0,92 MB
Metro Dubai

Short description

The Largest Driverless Metro in the World with
Sika’s Concrete Technologies

Date: 4/12/12
20_saw_metro_dubai_low.pdf
Download pdf